Aris-Idc Data Room Inspection
Aris-Idc Data Room Inspection
At present, the construction period of large-scale idcs is about 1-2 years and these data centers are usually located in remote areas, thus It is difficult to recruit technical personnel for daily inspection, operation and maintenance. Besides the labor cost and employee turnover rate is high. there are problems such as inadequate and inaccurate inspection in manual inspection process which lacks of data management and data application.
- Category : Robotics Design
- Designer : Xuan Li
- Designed For : YOUIBOT